Erection of  a Hard Roof  for Outdoor Refreshment Area (ORA) and Interior Decoration for Coffee Shop


1. In the Beginning

a. To engage Professional Engineer (PE) to submit and endorse drawings to the followings for Outdoor Refreshment Area (ORA):

1. Building Control Authority (BCA) 

2. Fire Safety Shelter Department (FSSD)

3. Housing Development Board (HDB)

4. National Environment Agency (NEA) 

b. To design,calculate and endorse on Re-enforced Concrete (RC) stumps/footings to hold Newly Proposed Metal Roof

c. To design,calculate and endorse on Main Structural framing elements of Roof

d. To purchase plans from Relevant Plans from BCA and FSSD for submission purpose

3.1 To dismantle Existing Canopy and Footings

3.2 To hack off Existing Poles and Lights

3.3 To excavate and cave out roots for New RC Footings

3.4 To remove Existing Gutter and rainwater downpipes (RWDPs)

4.1 To cast RC Footings (RC Stumps) to receive new timber support 

4.2 To supply waterproofing membrane

4.3 To make good peripheral of RC Footings with Heavy Duty Ceramic Tiles

4.4 To erect Metal Posts to support Metal roofing (8)

5.1 To erect Main Framing to support roof using 6-8mm thick Galvanized MS hollow sections 

5.2 To erect Proposed New Roof using Kalzip profiled Metal roofing with C-Channels and Purlins, Angle Plates, BRC Meshes and Insulations 

5.3 To cast New gutter and Aluminum Flashing with RWDPs 

6.1 To erect false ceiling panel using Calcium Silicate Boards 
6.2 To paint the ceiling

7.1To  install electricity wiring and board 
7.2 To install Fans and lights
7.3 To install sign boards for all stalls and whole coffee shop

8.1To clear debris after works

8.2To erect hoarding Works

8.3 To install kitchen tables and gas stoves and ventilation system
8.4 To make deposit to management

  9.  for ORA and $100,000 for interior/exterior decoration and kitchen appliances

10. Completion and in OperationT09LL2004G