Framing

May-June /2005

Floor truss first
<


MicroLams are yellow (with water-proofing) and truss are white (pine): no aged green truss here
<


T&G subflor is on
<

Non-weight bearing flood stud
<


The second floor framing
<
<

Inside shearing wall
<

Bath tubs are dropped by a crane
<

Roof truss done in one day with crane
<

The back of the house
<


The front
<


The roof
<

登录后才可评论.