Erection of a Hard Roof for Coffee Shop Outdoor Refreshment Area (ORA)
1. In the Beginning
A.
2. Preliminary Works (Sub-Total=$7000)
1. Building Control Authority (BCA)
2. Fire Safety Shelter Department (FSSD)
3. Housing Development Board (HDB)
4. National Environment Agency (NEA)
c. To design,calculate and endorse on Main Structural framing elements of Roof
d. To purchase plans from Relevant Plans from BCA and FSSD for submission purpose
3. Demonlition Works (Sub-Total=$950)
3.1 To dismantle Existing Canopy and Footings
3.2 To hack off Existing Poles and Lights
3.3 To excavate and cave out roots for New RC Footings
3.4 To remove Existing Gutter and rainwater downpipes (RWDPs)
4. Masonry Works (Sub-Total=$3,750)
4.1 To cast RC Footings (RC Stumps) to receive new timber support
4.2 To supply waterproofing membrane
5. Roofing Works (Sub-Total=$27,640)
5.1 To erect Main Framing to support roof using 6-8mm thick Galvanized MS hollow sections
5.3 To cast New gutter and Aluminum Flashing with RWDPs
6. False Ceiling Works (Sub-Total=$4,704)
6.1 To erect false ceiling panel using Calcium Silicate Boards
7. Electrical Works (Sub-Total=$1,350)
To install Two Fan Points (2) and Two Fans (2)
To install Eight Lighting Points (8) and Eight lights (8)
7.2 To hack for Concealed Works
8. Miscellaneous Works (Sub-Total=$400)
8.1To clear debris after works
8.3To make deposit to management