终于在美国国庆节之前close了,1个月的等待已经使我失去了大部分的装修热情。
不过活一点也没耽误,大部分的工具和材料都已经卖齐了。还买了厨房4大件+washer & dryer。
昨天签完合同就直奔“新房“,开始揭地毯,中间同事来参观,外甥女来捣乱,到9点半只揭了客厅、主卧和一半次卧。地毯下面还有一层垫子,是用staple钉的,还得一个一个拔出来。本来以为这种东西不可以丢垃圾桶,今天问了一圈,觉得没问题,放在垃圾桶旁边应该就会被收走。
大概列了个时间表,争取能干计划完成,感觉对自己的体力是个考验,白天上班,晚上装修。2年前我在上海时妻子自己在家装修,现在就快扯平了,不过我会更牛,因为我全都自己干,一个人干。
7/3/2013 | Buy laminatiing floor, tools, Remove Carpet, clean ceiling and wall, measure the kitchen area | |
7/4/2013 | Ceiling and wall painting, | |
7/5/2013 | Ceiling and wall painting, get quota of kitchen cabinet | |
7/6/2013 | Door and Window painting | |
7/7/2013 | Lighting fixure and outlet install | |
7/8/2013 | Lighting fixure and outlet install | |
7/9/2013 | Lighting fixure and outlet install | |
7/10/2013 | Buy Interior doors, closet accessories | |
7/11/2013 | Install interior doors knobs | |
7/12/2013 | Remove Kitchen Cabinet and vinyle tile | |
7/13/2013 | Install laminating floor | |
7/14/2013 | Install laminating floor | |
7/15/2013 | Install laminating floor, baseboard | |
7/16/2013 | Kitchen water and electric reorganize | |
7/17/2013 | Kitchen water and electric reorganize | |
7/18/2013 | Kitchen painting | |
7/19/2013 | buy kitchen floor tile, wall tile, thinset, grout, sealer, tools | |
7/20/2013 | Kitchen floor tile installation | |
7/21/2013 | Kitchen floor tile installation | |
7/22/2013 | Buy bath tiles and tools | |
7/23/2013 | Buy bath shower, glass door | |
7/24/2013 | Install bath shower, glass door | |
7/25/2013 | Install bath shower, glass door | |
7/26/2013 | Install bath floor tiles | |
7/27/2013 | Kitchen cabinet install | |
7/28/2013 | Kitchen cabinet install | |
7/29/2013 | Install toilet, bath cabinet | |
7/30/2013 | Install toilet, bath cabinet | |
7/31/2013 | Kitchen wall tile install | |
8/1/2013 | Range hood install | |
8/2/2013 | Bath cabinet install | |
8/3/2013 | Kitchen appliance and w/d delivery and install | |
8/4/2013 | Kitchen counter top and sink install | |
8/5/2013 | Kitchen counter top and sink install | |
8/6/2013 | Closet repairing and install | |
8/7/2013 | shutter install | |
8/8/2013 | Move in |